The Environmental Protection Agency, through the Safe Drinking Water Act - Surface Water Treatment Rule, required Pend Oreille Public Utility District No. 1 to treat surface water, serving drinking water the Town of Metaline Falls. Welch Comer Engineers first assisted the Utility District by preparing a Preliminary Engineering Report and an Environmental Assessment to assist the District in selection of a treatment option and site.
Once the District and Environmental Protection Agency accepted the engineering analysis prepared by Welch Comer Engineers, design plans and specifications were prepared for construction of a treatment plant, reservoir and waterline improvements with total construction costs totaling $1,266,840.
The Water Treatment Facility is located on the hydraulic grade line allowing gravity flow operation
Interior of Water Treatment Facility