PROJECT OVERVIEW

The Environmental Protection Agency, through the Safe Drinking Water Act - Surface Water Treatment Rule, required Pend Oreille Public Utility District No. 1 to treat surface water, serving drinking water the Town of Metaline Falls.  Welch Comer Engineers first assisted the Utility District by preparing a Preliminary Engineering Report and an Environmental Assessment to assist the District in selection of a treatment option and site.

Once the District and Environmental Protection Agency accepted the engineering analysis prepared by Welch Comer Engineers, design plans and specifications were prepared for construction of a treatment plant, reservoir and waterline improvements with total construction costs totaling $1,266,840. 

KEY ELEMENTS

  • Prepared Preliminary Engineering Report
  • Prepared EPA Environmental Assessment for a Finding of No Significant Impact
  • Designed Rapid Sand Filter to Treat 410 gpm of Raw Water for the North fork of Sullivan Creek.
  • Designed a Backwash and Filter to Waste Recycling System to Optimize Filter Plant Efficiency. 
  • Provided Survey Services for Property Acquisition.
  • Provided Permitting Services to gain the necessary permits from the Washington Department of Transportation and Department of Health.

 

The Water Treatment Facility is located on the hydraulic grade line allowing gravity flow operation